Ci-dessous une sélection des principales spécifications disponibles sur les compteurs intelligents au pays bas. Une mise a jour régulière est réalisée sur le site de l'energiened. Plusieurs technologies sont utilisées notamment: DLMS-COSEM pour les compteurs electrique et M-BUS et wireless M-BUS pour les compteurs sur piles.


(01/09) Dutch Smart Meter Requirements: Main Document V2.31


(08/07) NTA 8130: Minimum set of functions for metering of electricity, gas and thermal energy for domestic customers. (English version)


(01/09) NTA 8027: Minimum set of function for Smart Water Meters (only in dutch)


(01/09) Dutch Smart Meter Requirements: IP via Ethernet Requirements V2.31

This document defines the requirements for the IP via Ethernet communication. The main focus of this document is on requirements to be defined for (the communication device of)

the E meter.


(01/09) Dutch Smart Meter Requirements: GPRS Requirements V2.31

This document focuses on the P3 and P3.2 interfaces for Electricity meters and Data Concentrators since both interfaces can make use of a GPRS connection. The P3.2 interface is

introduced because a Data Concentrator (DC) can be placed between the CAS and the meter(

s). With this, the DC divides P3 into two parts, P3.1 and P3.2. The communication interface P3 (see figure 1.1) is based on the DLMS/COSEM standard and communication interface P3.2 is based on Web Services standards. GPRS meters and GPRS concentrators both contain 3GPP certified communication modules enabling them to connect to a GSM/GPRS network for data transmission. At a later stage, Grid operators might use alternative technologies for communication, for example UMTS, HSDPA, LTE, Wimax, SMS and/or Mesh.

Whenever the term Communication Unit is used within this document this applies for both the

communication unit of the meter and the communication unit of the DC since both can make use of a GPRS connection.


(01/09) Dutch Smart Meter Requirements: P1 Companion Standard V2.31

The goal of this companion standard is to reach an open, standardized protocol implementation and functional hardware requirements related to the communication between several types of Service Modules and a Metering System. Any specification in this standard is intended to encourage suppliers to develop their hardware and software in a common direction. Standardised protocols and hardware specifications are referred to as much as possible.


(01/09) Dutch Smart Meter Requirements: P2 Companion Standard V2.31

The goal of this companion standard is to reach an open, standardized protocol implementation and functional hardware requirements related to the communication between several types of meter and an electricity meter. The communication bus is based on the M-Bus and wirless M-BUS


(01/09) Dutch Smart Meter Requirements: P3 Companion Standard V2.31

This companion standard focuses on the P3 interface for Electricity meters. The goal of this companion standard is to reach an open, standardized protocol implementation based on DLMS/COSEM. This companion standard is the result of a combined effort of the major Dutch grid operators and different manufactures who defined the necessary DLMS/COSEM object mapping.


(01/09) Dutch Smart Meter Requirements: P3.1 Companion Standard V2.31

This companion standard focuses on the P3 interface for Electricity meters. The goal of this companion standard is to reach an open, standardized protocol implementation based on XML/Webservices. This companion standard is the result of a combined effort of the major Dutch grid operators and different manufactures who defined the necessary XML/Webservices object mapping.



Source: Basic Template English CENhttp://www.energiened.nl/